40 Independence Group NL

FY2015 Production

The Long Operation currently focuses on longhole stoping, supported by twin boom jumbo development. Safety and the

practicalities of the ore body dictate which extraction method is utilised.

The majority of production in FY2015 came from mining of the high grade Moran ore body. Production achieved (Table 1) was

258,634t (FY2014: 268,162t ) at an average grade of 3.94% nickel (FY2014: 4.07%) for 10,198t of contained nickel metal (FY2014:

10,909t), 2% above the upper range of FY2015 guidance.

Payable cash costs for FY2015 including royalties and by-product credits were $4.01/Ib Ni (FY2014: $3.78), which was 6% below

the lower end of FY2015 guidance.

Long Operation – FY2015 Ore Production

Orebody

Ore Tonnes

Ni %

Ni Tonnes

Source of Ore

Tonnes as %

Long (mechanised and hand-held)

37,955

3.0

1,148

14.8

Victor South (mechanised)

13,128

2.1

275

5.0

McLeay (mechanised and hand-held)

31,340

2.8

866

12.1

Moran (mechanised)

176,211

4.5

7,909

68.1

TOTAL

258,634

3.9

10,198

100.0%

Figure 10: Quarterly Mine Production and Cash Cost performance in last eight quarters

Contained Nickel (t)

Cash Costs ($/lb NI)

Sep 13 Dec 13 Mar 14 Jun 14 Sep 14 Dec 14 Mar 15 Jun 15

3,500

3,000

2,500

2,000

1,500

1,000

500

-

$7.00

$6.00

$5.00

$4.00

$3.00

$2.00

$1.00

$0.00

Production Guidance

Cash costs ($/lb Ni)

Cost Guidance

Contained Nickel (t)

Figure 11: Quarterly tonnes mined versus resources depletion at Long in last eight quarters

Sep 13 Dec 13 Mar 14 Jun 14 Sep 14 Dec 14 Mar 15 Jun 15

Ore tonnes

80,000

70,000

60,000

50,000

40,000

30,000

20,000

10,000

0

Mined

Reserve Depletion