Table of Contents Table of Contents
Previous Page  35 / 164 Next Page
Information
Show Menu
Previous Page 35 / 164 Next Page
Page Background

Annual Report 2015 35

Regional Exploration

Regional exploration continued, identifying and testing numerous prospects throughout FY2015. A systematic strategy of

dropping non-prospective ground has been employed by the joint venture. AngloGold Ashanti is prioritising geological and

structural targets in prospective domains and rock packages to ensure targeted exploration. In total, 774 AC holes (46,514m),

65 RC holes (7,465m) and eight diamond holes (1,312m) were completed in FY2015.

During FY2015, drilling at the Madras prospect, 25km to the south of Tropicana discovered a zone of supergene mineralisation

with a number of highly encouraging intercepts including 15m @ 5.1g/t Au, 25m @ 2.5g/t Au and 17m @ 4.2g/t Au. Encouraging

results were returned at other targets including 4m @ 1.0g/t Au at Scarecrow and 8m @ 0.8g/t Au at Sanpan.

Figure 8: Tropicana Joint Venture tenure

Tropicana Gold Mine

6,800,000mN

6,700,000mN

6,600,000mN

6,800,000mN

6,700,000mN

6,600,000mN

600,000mE

700,000mE

600,000mE

700,000mE

Madras/Masala

10.4

m @ 1.7 g/t Au

m @ 2.1 g/t Au

m @ 1.6 g/t Au

m @ 1.5 g/t Au

m @ 1.1 g/t Au

m @ 1.2 g/t Au

m @ 1.2 g/t Au

m @ 3.5 g/t Au

(DD)

(DD)

(RC)

(RC)

(RC)

(RC)

(RC)

(RC)

4.0

2.0

18.0

4.0

6.0

6.0

2.0

Note: Widths quoted are down hole widths.

Geochemical (Au)

Image Legend

2ppb

3ppb

5ppb

>6ppb

Tropicana JV

Salt Creek JV

SCJV AC Drilling

0 500

kilometres

Perth

Geraldton

WA

Tropicana JV

Kalgoorlie

Location Map

0

25

kilometres

MGA Zone 51 (GDA94)

N

Note: See June 2015 Quarterly Report released to ASX on 29 July 2015