FY2016 Guidance

Production guidance for the Jaguar Operation for FY2016 is for production of 7,500 – 8,500t of copper metal and 35,000 –

40,000t of zinc metal in concentrate. Cash costs for FY2016 are forecast at $0.40 – $0.60/Ib Zn, including royalty and net of

by-product credits.

Sustaining capital, development and exploration expenditure are forecast to be $4 – $5 million, $12 – $14 million and $10 – $12

million respectively during FY2016.

Near Mine Exploration

In April 2015, IGO commenced development of a drill drive in the hanging wall of the Bentley mine to provide a platform to

enable infill drilling to convert the Bentley Inferred Resource to Indicated category. It will also serve as a platform to test for

depth extensions of the Arnage and Flying Spur lenses. The drill drive was completed in June 2015 and drilling commenced in

July 2015.

A detailed structural study of the Bentley Deeps area was completed during FY2015. The study aimed to determine the

structural controls on mineralisation that may provide vectors to potential depth extensions to the Arnage and Flying Spur

lenses. A key outcome of the study was the determination that there are no major late structural dislocations of mineralisation

in the down plunge position. It is interpreted that the highest potential for additional proximal mineralisation lies along the

sub-horizontal early growth/feeder fault in the footwall rhyolite – volcaniclastic interface, immediately down-dip of Arnage. Drill

testing of this target area is planned for FY2016.

Figure 18: Jaguar Operation: Bentley Composite Long Section showing location of Flying Spur and Bentley Deeps drill holes.

Down hole widths are true widths.

4250RL

51750mN

51500mN

51250mN

51000mN

50750mN

4000RL

3750RL

3500RL

3250RL

13BUDD143

13BUDD138

13BUDD136

13BUDD145

13BUDD139

10BTDD012

14BUDD014

1.28m @ 22.8% Zn, 1.5% Cu, 356 g/t Ag, 2.4 g/t Au

14BUDD015

1.8m @ 0.5% Zn, 347 g/t Ag, 3.9 g/t Au

14BUDD012

0.6m @ 8.6% Zn, 63 g/t Ag, 0.1 g/t Au

14BUDD016

2.9m @ 22.4% Zn, 0.5% Cu, 257 g/t Ag, 2.6 g/t Au

10BTDD016

14BTDD001W1

7.8m @ 10.1% Zn, 2.5% Cu, 99 g/t Ag, 1.1 g/t Au

14BTDD001

0.4m @ 8.1% Zn, 0.2% Cu, 13 g/t Ag, 0.2 g/t Au

14BTDD001W1

6.2m @ 2.6% Zn, 0.1% Cu, 45 g/t Ag, 1.6 g/t Au

0

200m

N

Jaguar Mine Grid

Looking East

Recent Drilling

Previous Drilling

Planned Drilling

Arnage

Brooklands

Comet

Mulsanne

Flying Spur

Open

Open

250m

Open

Note: widths quoted are true widths.

Note: North is to the left in the diagram. See ASX release dated 22 September 2014